
IBM System p Solution Sales : 000-229 Exam
Test information:
• Number of questions: 64
• Time allowed in minutes: 90
• Required passing score: 52%
Related certifications:
• IBM Certified Specialist — IBM System p Solution Sales V5.3
Exam Topics Include:
• Customer requirements / qualification
• Value Proposition
• Product Positioning – Price, Performance, and Capabilities
• Competition
• Hardware Technology
• System p Software and Licensed Program Products
• Virtualization
1.Which of the following pricing methods provides a way to determine the lowest cost to the
customer in a competitive situation?
A.Standard discount tables B.Special bid or pricing process C.System p Express configurations
D.Low Price Configuration option in eConfig
Correct:B
2.A university has a cluster of System p5 servers, which they are using to perform various HPC workloads. They are presently using Gigabit Ethernet and need more bandwidth. What other choices should be offered for a cluster network?
A.IBM InfiniBand adapters and switches
B.FICON channel adapters and switch complex
C.Virtual I/O server and more virtual Ethernet adapters D.Industry standard token ring using the GX bus adapters Correct:A
3.A customer in the travel industry has seen tremendous growth in their application which currently resides on a p5550 server. They think they are nearing capacity. They are considering a replacement and are concerned with scalability. Which of the following models should the sales rep recommend?
A.16 core System p5 570
B.8 core System p5 550Q
C.8 core System p5 570 with 8 processors on demand D.4 core System p5 570 with 12 processors on demand Correct:D
4.When discussing the flexibility of System p family of servers with a prospective customer, which
of the following is a key aspect?
A.Binary compatibility between servers
B.Hot pluggable processor and memory boards C.Consistent CoD features with entire family D.Ability to interchange features between systems Correct:A
5.A System p sales representative has a meeting with the CIO of a telecommunications company. They have purchased several older RS/6000s in the past. This customer has an ample budget for purchases and is anxious to order additional servers. Which of the following is key for the IBM System p sales representative to identify?
A.Adequate funding B.The business problem C.System p installations
D.The key decisionmaker
Correct:B
6.A large financial services company would like to have a remote recovery system for their production environment that handles daily processing. They are very interested in IBM POWER5 enterprise servers. What type of server solution should be discussed to accomplish these
objectives?
A.A System p5 590 Capacity BackUp solution can provide a very economical recovery solution.
B.Two System p5 570 systems with GeoRM can provide remote system failover and automatic recovery. C.A System p5 595 can use HACMP to failover the production LPARs to available Capacity on Demand LPARs on the same server.
D.A System p5 575 can be clustered with CSM and LoadLeveler to achieve enterprise class recovery for production environments.
Correct:A
7.A System p customer has a large database server and six other application servers running AIX
5L. Disk storage is being used up rapidly. What can the customer use to proactively monitor system utilization and plan for how storage demands may affect the servers?
A.LoadLeveler
B.AIX Toolbox
C.PM pSeries (PM for System p) D.Workload Manager
Correct:C
8.A customer receives direction from their parent company to deploy a home grown memory intensive application that requires a minimum of 1 TB of memory. Which of the following System
p5 servers should the sales rep recommend?
A.p5590
B.p5570
C.p5560Q D.p5550Q Correct:A
9.A customer is concerned that if several systems are consolidated on a single System p5, the administration costs will not go down. Which virtualization feature should be discussed to minimize this concern?
A.Virtual LAN (VLAN) B.Virtual I/O Server (VIOS)
C.Dynamic Logical Partition (DLPAR) D.Simultaneous Multithreading (SMT) Correct:C
10.A prospective customer with an existing complex environment is requesting a proposal for a Tivoli Storage Manager (TSM) data management solution. What should be the first step taken to validate the customer’s project?
A.Perform a TSM benchmark. B.Verify funding.
C.Describe the TSM pricing model. D.Survey customer’s current environment. Correct:B
11.A company is investigating replacing servers with either HP or System p. They are impressed with HP’s claim to monitor system utilization without manual intervention. Which of the following IBM features addresses this issue?
A.WebSM
B.PM pSeries (PM for System p) C.IBM Director
D.Logical Volume Manager
Correct:B
12.A retail store owner is frustrated by the inability to fully utilize the large amounts of customer and product data. Which solution type addresses this need?
A.Business Intelligence (BI) B.Collaboration and Messaging C.Enterprise Resource Planning (ERP)
D.Customer Resource Management (CRM)
Correct:A
13.A customer has a cluster of System p5 510 servers and is considering an InfiniBand connection. Which operating system(s) can the cluster be running to support InfiniBand?
A.AIX 5L V5.3
B.SUSE LINUX and Red Hat
C.AIX 5L V5.3, SUSE LINUX Enterprise Server 8 and 9, and Red Hat AS Version 4
D.AIX 5L V5.3 or later, and SUSE LINUX Enterprise Server 9 for POWER or later
Correct:D
14.Which of the following properly describes the 4port Ethernet PCI adapter card used in IBM System p servers?
A.The four Ethernet connections on the card share a common PCI bus. B.Four ports operate at half duplex or two ports can operate at full duplex. C.A single connection provides the virtual bandwidth of four Ethernet cards.
D.Four separate LPARs can each use a port on the 4port Ethernet PCI adapter card.
Correct:A
15.A customer plans to consolidate several web applications. Upper management is very concerned about data security between applications but is very cost conscious. Which of the following will best meet their requirements?
A.Use DLPAR to isolate web applications. B.Use VIOS to isolate the web applications.
C.Purchase separate System p servers to isolate each web server application.
D.Assign separate disk space on a standalone storage device to isolate web applications.
Correct:A
16.A potential customer plans to use a System p5 server or servers for computeintensive genetic research. Which of the following should be considered?
A.One or more System p5 575 servers
B.A cluster of System p5 550 servers
C.A network of IntelliStation POWER 185 units D.A large network of System p5 185 servers Correct:A
17.A customer has many Linux based System p5 510 servers. The customer wants to cluster the systems. Which of the following software management tools should be discussed with the
customer in order to satisfy the requirements?
A.PSSP and CSM
B.CSM and IBM Director
C.IBM Director and Tivoli System Automation
D.IBM Director and Advanced Power Virtualization
Correct:B
18.Which of the following is the key benefit of Advanced POWER Virtualization (APV)?
A.Runs AIX 5L, HPUX, and Solaris
B.Reduces IT costs by sharing resources between multiple systems
C.Reduces total cost of ownership by improving server utilization
D.Improves business responsiveness by sharing resources between servers
Correct:C
19.A Sun sales rep has explained to an IT manager that Sun offers CPU deallocation just like IBM. What should the IBM sales rep discuss to refute this claim?
A.In order for Sun to perform deallocation, they must have spare processors.
B.Sun servers provide CPU deallocation via hot swap. IBM automatically deallocates a processor after a failure.
C.After a CPU failure, the Sun partition must reboot. IBM System p5 does not need to reboot during deallocation.
D.During a CPU failure, the Sun application is suspended while the processor is replaced. IBM allows the application to continue to run.
Correct:C
20.How can Integrated Virtualization Manager (IVM) be acquired?
A.It is included with AIX 5L V5.3.
B.It is included with Advanced Power Virtualization.
C.It is part of ASMI (Advanced System Management Interface).
D.The Virtualization agent can be downloaded from the Hardware Management Console.
Correct:B
21.A customer is considering replacement of their POWER4 server. They do not believe a replacement would be less costly than using a fully paid asset. Which of the following factors in POWER5 are relevant in convincing them otherwise?
A.Application costs, AIX 5L SWMA, and floor space
B.Power, cooling, 24 x 7 support, and application costs
C.AIX 5L administration, hardware maintenance, and Oracle costs
D.Floor space, power and cooling, AIX 5L SWMA, and hardware maintenance
Correct:D
22.A solution provider is making a sales call on an HP customer running a PARISC based system. Three years earlier the customer had ported their Compaq Alpha application to HPUX on PARISC. The IT manager is very concerned about the end of life of PARISC and is considering moving from UNIX to Windows. What should the solution provider discuss to persuade them to move to AIX 5L on POWER?
A.POWER processor roadmap
B.Migration Factory offerings
C.Ability to run LINUX on POWER
D.IBM’s field service reputation
Correct:A
23.A small company is considering the purchase of four System p5 505 servers but wants them to access disk storage in a failover scenario using the EXP24. What method of connectivity is required to accomplish this configuration?
A.SCSI B.RIO2
C.Ethernet D.Fibre Channel Correct:A
24.A major financial services company wants to consolidate their older RS/6000 environment. The CIO is concerned about total cost of ownership with the new environment. What System p benefit should be communicated during the initial sales meeting?
A.IBM System p low memory and disk costs lead to lower TCO.
B.Low AIX 5L software licensing costs on IBM System p leads to lower TCO. C.IBM System p price/performance and low operation cost lead to lower TCO.
D.IBM System p RAS eliminating the need for redundant systems leads to lower TCO.
Correct:C
25.A prospect would like to migrate and consolidate applications from Sun servers to a new System p enterprise server. The applications are growing and will double in needed capacity within one year. The prospect’s budget will be significantly reduced next year. The current budget does NOT cover next year’s capacity. Which of the following should the System p sales rep recommend?
A.Purchase a System p server large enough for future growth.
B.Use CPU and memory CoD options with activation costs next year.
C.Implement VIOS to reduce the number of required servers and lower software costs. D.Utilize the excess hardware capacity required during conversion from Solaris to AIX 5L. Correct:B
26.A customer wants a lowcost server to host a small Oracle database application. The total cost
of the solution must be relatively low. Their Independent Software Vendor indicated that the solution requires a minimum of six disks. Which System p5 server provides the best lowcost solution for this situation?
A.p5505Q B.p5550Q C.p5520Q D.p5510Q Correct:C
27.A candy factory wants to purchase an SMP server to run a new database application. After some careful research, the CIO requested the following specs: UNIX, 64bit, 8 CPU, 16GB Memory,
14 PCIX slots, and 300GB of internal disk. Which System p5 server best meets these requirements at the lowest cost?
A.p5570
B.p5575
C.p5560Q D.p5550Q Correct:D
28.A System p5 sales specialist is calling on an HP UNIX installed account. The account believes the HP Itanium system has the same features and functionality for their application as the System p5. What fact should the sales rep bring into the conversation?
A.IBM System p5 offers better RAS than HP. B.IBM System p5 can run LINUX and HP cannot.
C.IBM System p5 offers virtualization capabilities.
D.IBM System p5 has superior OLTP performance over HP.
Correct:D
29.A customer is consolidating servers and needs to run i5/OS in a partition. Which IBM System p5 servers support this?
A.p5570, p5590, p5595
B.p5510, p5520, p5550
C.p5520, p5550, p5560
D.p5185, p5505, p5510
Correct:A
30.A local auto parts manufacturer has a midclass eight processor Sun server running an Oracle database. They have approached IBM for a replacement server because they are unhappy with the performance of the server. Which of the following should the sales rep recommend as a replacement?
A.p5570 with QCM processors B.p5520 with DCM processors C.p5510 with DCM processors D.p5550Q with QCM processors Correct:C
Testking ibm 000-229 Interactive Testing Engine Included!
266 Questions
Updated : 09/18/2008
Price : $87.99 $79.99
Free down:Testking ibm 000-229
Free down:Pass4sure ibm 000-229
| IBM Free Downloads |
|
Type |
Exam Bible | New Questions & Answers |
Latest Updated |
Download link |
![]() |
All Ibm 's Exam Pack |
767 |
1 days ago | Download |
If you would like to make a comment, please fill out the form below.
I need IBM 229 exam dumps
[...] testking 000-229 [...]