pass4sure ibm 000-424

By PassGuide-IBM Study Guide | Oct 10, 2008
Visited 258 times, 2 so far today

ibm eserver zseries sales,version1 : 000-424 Exam
Known also as the IBM IBM zSeries Sales V1 (000-424), this exam plays an integral role in obtaining your certification. All IBM certification exams are extremely detailed and cover many different technological areas. We designed the 000-424 questions and answers for this very purpose, to prepare you for the unexpected. Beyond the testing center, the skills you learn and the knowledge you confirm using the 000-424 practice exams and exam simulators will translate directly into your daily work environment.
Product Description

Exam Number/Code: 000-424

Exam Name:ibm eserver zseries sales,version1

“ibm eserver zseries sales,version1″, also known as 000-424 exam, is a IBM certification. With the complete collection of questions and answers, Pass4sure has assembled to take you through 140 questions to your 000-424 Exam preparation. In the 000-424 exam resources, you will cover every field and category in IBM certifications helping to ready you for your successful IBM Certification.

Question: 1
The customer’s direction is to get off the mainframe because of cost concerns. Which of the following should the zSeries Sales Specialist do?

A. Convince the customer to only use the mainframe for a database server
B. Move on to the next customer since this customer is already leaving the mainframe
C. Work with the customer to migrate the zSeries workloads to a distributed platform
D. Work with the customer to understand their issues and see what can be done to preserve zSeries footprint
E. Convince the customer to only use the mainframe for a database server
Answer: D Question: 2
Which of the following statements best describes a customer’s pain point that a sales specialist can immediately act upon?

A. “Which solution is right for my environment? There are so many to pick from.”
B. “I cannot get the payroll done in time each month, and it is costing me dearly in penalties.”
C. “Our outage window is one weekend a month. I cannot afford to have the system down any additional time.”
D. “We are on older technology. I know that getting up to date will help us improve on our customer satisfaction.”
Answer: B Question: 3
Which of the following is the software pricing model that was introduced with the IBM eServer
z890?

A. EWLC B. NALC C. PSLC D. zELC
Answer: A Question: 4
Which of the following operating systems is specially designed for the IBM eServer zSeries 800
and 890?

A. VSE
B. z/OS 1.4
C. z/OS.e
D. z/VM
Answer: C Question: 5
The customer needs additional capacity and requested a used upgrade. The zSeries Sales
Specialist has provided the customer with a used and new proposal. The new solution has lower costs over three years compared to the used solution due to significantly lower maintenance costs.
The customer accepts the new proposal, but wants to make sure that everything about the installation goes smoothly. How can the sales specialist ensure that everything will go smoothly?

A. Offer IGS Operational Services.
B. Contact TechLine to involve services offerings.
C. Work closely with the customer and IBM teams to develop a pre- and post-installation plan. D. Hand the pre- and post-installation tasks over to the technical specialist.
Answer: C Question: 6
Which of the following are prerequisites for running a zAAP?

A. Java 1.4.1, IBM z/OS 1.6
B. WebSphere V4 or V5, IBM z/OS 1.3
C. IBM z/VM V5, Linux with SuSE SLES V8
D. IBM z/VM V4, Linux with SuSE SLES V8
Answer: A Question: 7
A VM/VSE customer wants to implement a WebSphere Application Server (WAS) on an existing zSeries server. On which of the following operating environments would WAS best be implemented?

A. Linux
B. OS/390
C. z/VM D. VSE
Answer: A Question: 8
When looking at a 3-year Total Cost of Computing Analysis for a traditional zSeries, which factor
typically has the largest influence on the total cost of the solution?

A. Services B. Software C. Hardware
D. Hardware Maintenance
Answer: B Question: 9
The OSA-ICC is most similar in function to which of the following devices?

A. 37XX Communications Controller
B. ESCON Director
C. 2029 Fiber Saver
D. 2074 Console Support Controller
Answer: D Question: 10
When recommending z/OS.e as a solution for New Workload software price reduction, which of the following key areas need to be addressed?

A. Has a Special Bid been submitted to approve the New Workload Application running under
z/OS.e?
B. Is the New Workload Application supported on z/OS.e (that is, will it run under z/OS.e)?
C. Is z/OS.e compatible with zSeries z890 processors? What level of z/OS.e is required?
D. Is z/VM able to support the workload that is anticipated by the New Workload application?
Answer: B Question: 11
A z/OS customer is trying to decide whether to acquire an IBM eServer 9672-z77 or an IBM
eServer z990. What risk will the customer need to consider on the IBM z77?

A. z/OS is not supported.
B. z/OS will not support Linux. C. z/OS requires z/VM to run.
D. z/OS support for an IBM 9672 ends March 2007.
Answer: D Question: 12
A customer needs an upgrade from a 2 CP IBM eServer z900 to a 3 CP IBM eServer z900. Which of the following tools would a zSeries Sales Specialist use to create the configuration?

A. eConfig
B. Rapid Online
C. CP2000
D. eLink
Answer: A Question: 13
A customer with VM/VSE on an IBM 9672 with 60 MIPS and an IBM RVA with 1 TB wants to migrate his workload into a WAS Solution in the next 48 months. If the customer is interested in
migration to WAS on Linux under z/VM, which of the following should the zSeries Sales Specialist
offer?

A. IBM eServer z890, MLC for the remaining traditional workload and an IBM TotalStorage ESS
B. IBM eServer z890, MLC for the remaining traditional workload and an IBM TotalStorage FAStT
C. IBM eServer z890, WLC for the remaining traditional workload and an IBM TotalStorage ESS
D. IBM eServer z890, WLC for the remaining traditional workload and an IBM TotalStorage
FAStT
Answer: C Question: 14
A customer has recently acquired another company, and now has mission-critical applications requiring a back-up location. The customer is planning on consolidating datacenters, since cost is
an issue. The customer asks for 2 CBU Tests per year. Which of the following needs to be done
to fulfill this requirement?

A. CBU Tests are free; the customer may run as many as needed.
B. Ten CBU Tests are provided in the 5-year contract, which fulfills the customer’s requirement.
C. The specialist needs to help the customer understand the ease of use and stability of CBU, such that CBU Testing is not required.

D. The specialist should explain that 5 tests come standard with a CBU contract and that
additional tests can be purchased when the 5 tests are used.
Answer: D Question: 15
A customer wants to go into production with WebSphere, but does not have budget for additional capacity this year. Microsoft has offered an inexpensive solution. Which of the following should
the zSeries Sales Specialist recommend?

A. Defer full production until next year
B. Outsource the WebSphere workload to IGS C. Temporarily migrate to Windows on xSeries
D. An IBM Global Financing lease with deferred payment
Answer: D Question: 16
While meeting to discuss future upgrade options, the customer asks the zSeries Sales Specialist
to see an LSPR comparison of their current processor to a new processor. Which of the following IBM workstation tools would the sales specialist be able to show the customer to present the differences?

A. CP2000
B. zPCR C. SCRT
D. eConfig
Answer: B Question: 17
Which of the following best describes the operating environment required to take advantage of
EWLC sub-capacity pricing?

A. The processor must be running multiple LPAR in Basic mode with z/OS 1.4. B. LPAR mode with z/OS 1.4 or above running in 64-bit mode.
C. Multiple operating systems must be installed. D. Linux must be installed across all LPAR.
Answer: B Question: 18
Which of the following software pricing metrics offers a sub-capacity option?

A. PSLC B. EWLC C. GOLC D. zELC
Answer: B Question: 19
SAP R/3 can be hosted on IBM eServer zSeries under all of the following configurations EXCEPT

A. Application and database serving under z/OS

# pass4sure ibm 000-424 Questions and Answers : 140 questions
# Updated: October 4th , 2008
# Price: $159.99 $99.99
Free down:Testking ibm 000-424
Free down:Pass4sure ibm 000-424

Bookmark and Share
IBM Free Downloads

Type

Exam Bible New Questions & Answers

Latest Updated

Download link
Testking torrent All Ibm 's Exam Pack

767

1 days ago Download
pass4sure ibm

Random Posts

testking ibm
2 Comments so far
  1. [...] 6 pass4sure 000-389 Exam : IBM TotalStorage Networking and Virtualization Architecture, Version 2 pass4sure 000-424 Exam : IBM zSeries Sales V1 pass4sure 000-512 Exam : DB2 UDB V7.1 Family Fundamentals pass4sure [...]

  2. [...] Pass4sure 000-424 Testking 000-424 Actualtest 000-424 [...]

Leave a Comment

If you would like to make a comment, please fill out the form below.

Name (required)

Email (required)

Website

Comments

© 2007 IBM Certification Exams, - IBM Sitemap ibm exams