pass4sure ibm 000-180

By PassGuide-IBM Study Guide | Oct 9, 2008
Visited 273 times, 1 so far today

p5 and pSeries Enterprise Technical Support AIX 5L V5.3 : 000-180 Exam
Test information:
• Number of questions: 66
• Time allowed in minutes: 75
• Required passing score: 54%

Related certifications:
• IBM Certified Systems Expert — eServer p5 and pSeries Enterprise Technical Support AIX 5L V5.3
• IBM Certified Systems Expert — IBM System p5 Virtualization Technical Support
• IBM Certified Advanced Technical Expert — IBM System p5 2006

Exam Topics Include:
• System Planning and Design
• Installation and Configuration
• Hardware Management
• Ongoing Support
• Virtualization
Product Description

Exam Number/Code: 000-180

Exam Name:p5 and pSeries Enterprise Technical Support AIX 5L V5.3

“p5 and pSeries Enterprise Technical Support AIX 5L V5.3″, also known as 000-180 exam, is a IBM certification. With the complete collection of questions and answers, Pass4sure has assembled to take you through 132 questions to your 000-180 Exam preparation. In the 000-180 exam resources, you will cover every field and category in IBM certifications helping to ready you for your successful IBM Certification.

Exam Details

This certification validates the skills required to plan, to install, to configure and to manage IBM p5 and pSeries Enterprise systems. In addition, the candidate should be able to perform the administrative and diagnostic activities needed to support logical partitions. This certification is applicable to specialists who implement and support complex partitioned POWER4 and POWER5 environments. To attain the IBM Certified Systems Expert – p5 and pSeries Enterprise Technical Support AIX 5L V5.3 certification, candidates must pass 2 tests. One test must be from the list under “Required Prerequisite(s)” below The other test must be the p5 and pSeries Enterprise Technical Support AIX 5L V5.3 exam (Test 180).

QUESTION 1:

For the p5 590 and p5 595 servers, the HMC must be directly attached. Why is the use of
a private service network between HMC and the p5 590 required?

A. The Bulk Power Controllers are dependent upon the HMC to provide them with
DHCP addresses.
B. A firewall is required to isolate the private network from any of the open networks to which the HMC is attached.
C. Network communications can be implemented through an open network. No private network is required but it is recommended.
D. All p5 590 and 595 servers are shipped with one service processor card. A private network is required to manage DHCP addresses.

Answer: A

QUESTION 2:

A system administrator wants to control the HMC from their workstation. Microsoft Windows 2000 is running and the HMC graphical user interface is being used remotely. Which of the following actions will accomplish this task?

A. Use any Windows 2000 to graphically access the HMC B. Load, install, and configure WebSM on the workstation
C. Telnet to the HMC using Exceed or a GUI emulator product from the workstation
D. Load, install, and configure OpenSSH or SSH on the workstation and access the HMC
through the GUI interface

Answer: B

QUESTION 3:

Certkiller .com currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?

A. Include a new HMC in the order to connect to the p5 595
B. Include a pair of new HMCs in the order to connect to the p5 595
C. Include a media set for POWER5 HMC in the order to upgrade one of the existing
HMC’s to POWER5 capabilities
D. Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? to POWER5 capabilities

Answer: B

QUESTION 4:

A system administrator is installing a p5 590 server with an HMC. After pulling the websm client down, it is not possible to connect to the HMC. The HMC can be pinged from the client. Which of the following settings should be verified next?

A. The routes on the HMC
B. The firewall setting of the LAN adapter
C. The name resolution protocol on the p5 590 server
D. The subnet mask settings on the Ethernet adapters

Answer: B

QUESTION 5:

Certkiller .com has seven days of vmstat data on four p5 590 production LPARs of four processors each. The data shows that all four LPARs have periodic utilizations of
90-95% lasting several minutes in duration. However, the average utilizations of the four LPARs were between 15-30%. The vmstat data shows that the peak utilizations of each LPAR do not occur at the same time. Which of the following should be set up?

A. A shared pool with four capped LPARs
B. A shared pool with four uncapped LPARs
C. Four dedicated LPARs and use DLPAR to manage resources effectively
D. The server in SMP mode and use WLM to manage resources effectively

Answer: B

QUESTION 6:

Certkiller .com will be using Virtual IO Server to share Ethernet adapters. What can be done to prevent network failure of the client if a Virtual IO Server goes down?

A. Create two virtual adapters on the client, each one from a separate Virtual IO Server
B. Enable dead gateway detection on the client so that the network traffic can be rerouted
C. Have a spare network card on standby in the client in case the Virtual IO Server goes down
D. Create an etherchannel adapter on the client using one Virtual Ethernet adapter from two separate Virtual IO Servers

Answer: A

QUESTION 7:

Certkiller .com has a system running AIX 5.2 and wants to upgrade to AIX 5.3. What method would provide the quickest recovery if the upgrade failed?

A. Use alt_disk_install
B. Backup image to NIM server
C. Backup using mksysb to DVD-RAM D. Apply the upgrade and do not commit

Answer: A

QUESTION 8:

Certkiller .com has a p5 595 running 12 LPARs. They are interested in high bandwidth, secure communication between two of the LPARs within the p5 595 server. They do not have any unused Ethernet adapters. Which of the following recommendations will best meet this requirement?

A. Utilize the integrated 10/100/1000 network interface
B. Implement Virtual Ethernet to enable inter-partition communication
C. Implement shared Ethernet with the Ethernet adapters utilized in the other LPARs
D. Implement a Point to Point protocol serial communication between the p5 595 serial ports

Answer: B

QUESTION 9:

When doing the Solution Assurance for a p5 570 with several LPARs, it is discovered
that the customer plans to back the system up using mksysb. The customer would like to
do unattended automated system backups and incorporate them into their off-site data recovery system. Which mksysb solution should be implemented?

A. A local DVD-ROM drive
B. A NFS mount on a NIM Master
C. A SSA disk array and mirror the data
D. A local tape drive and use DLPAR to move the tape to each LPAR Answer: B
QUESTION 10:

Service Focal Point, Inventory Scout, and DLPAR rely on correct setup and networking between the HMC and the logical partitions. Which authentication method is used to control session management, but also authentication between network peers?

* pass4sure ibm 000-180 Questions and Answers : 132 questions
* Updated: October 2nd , 2008
* Price: $159.99 $99.99
Free down:Testking ibm 000-180
Free down:Pass4sure ibm 000-180

Bookmark and Share
IBM Free Downloads

Type

Exam Bible New Questions & Answers

Latest Updated

Download link
Testking torrent All Ibm 's Exam Pack

767

1 days ago Download
pass4sure ibm

Random Posts

testking ibm
3 Comments so far
  1. [...] Technical High Performance Servers V2 pass4sure 000-078 Exam : xSeries Technical BladeCenter pass4sure 000-180 Exam : p5 and pSeries Enterprise Technical Support AIX 5L V5.3 pass4sure 000-197 Exam : pSeries [...]

  2. [...] Technical High Performance Servers V2 pass4sure 000-078 Exam : xSeries Technical BladeCenter pass4sure 000-180 Exam : p5 and pSeries Enterprise Technical Support AIX 5L V5.3 pass4sure 000-197 Exam : pSeries [...]

  3. [...] Pass4sure 000-180 Testking 000-180 Actualtest 000-180 [...]

Leave a Comment

If you would like to make a comment, please fill out the form below.

Name (required)

Email (required)

Website

Comments

© 2007 IBM Certification Exams, - IBM Sitemap ibm exams